B-1.1, r. 6.1 - Regulation respecting pressure installations

Full text
76. In addition to the components listed in sections 72 and 73, the external inspection of a pressure vessel subject to a corrosion rate control must include
(1)  the verification of the surface of at least one exposed part of the vessel’s coating; and
(2)  the determination of the thickness of the walls and comparison with the results obtained at the time of previous external inspections.
O.C. 89-2018, s. 76.
In force: 2018-03-08
76. In addition to the components listed in sections 72 and 73, the external inspection of a pressure vessel subject to a corrosion rate control must include
(1)  the verification of the surface of at least one exposed part of the vessel’s coating; and
(2)  the determination of the thickness of the walls and comparison with the results obtained at the time of previous external inspections.
O.C. 89-2018, s. 76.